I hope every one had a great holidays and got everything they were hoping for. Santa and my sexy wife were good to Watson and I this year.
Under the tree were all parts require to complete the rebuild of the 1098cc motor: Bearings, Gaskets, and a few other odds and ends.
Todays project was replacing the valve guide I broke getting the stuck valve out.
First a 6 ton arbor press is your friend, best investment I have made. Out with the old, no heat needed the press did all the work
One broken valve out.
New valve going in
New valve in, please ignore the oxidation. The head has been sitting on the shelf for a bit. I will wipe down before final install.
Only took about 15 minutes, and that was developing a plan of attack as I went. I only did the broken one, because I had heard it was a pain in the butt to replace the guides. I may replace them all now.
As I used a straight edge to find the depth to press the guide to, I found that none of the guide were at the same height. Germans have precision engineering; the Brits have "that will work".