Just did the brakes (drilled and slotted w/ green stuff pads) from Mini Sport USA. Started the coolant flush and going to run it for 3-6 hours or a few days worth of driving. About 200 miles or so (after the break-in coating is gone) will be the bed-in procedure to get it stopping nicely.
Winter projects
in Maintenance & Modifications
Posted
Just did the brakes (drilled and slotted w/ green stuff pads) from Mini Sport USA. Started the coolant flush and going to run it for 3-6 hours or a few days worth of driving. About 200 miles or so (after the break-in coating is gone) will be the bed-in procedure to get it stopping nicely.